Client: Kaliroy / Destilmex
Location: Navolato, Sinaloa
Duration: 07/2007 – 02/2008
Scope: Supply, fabrication, erection and painting of structure, tanks. 1000 Tons
Piping Installation 8000mts.
Installation of mechanical equipment, pumps and electric system.